Working in collaboration with Fairview New Homes, Woodford are on site at New Malden, Kingston - Upon - Thames. 297 New residential homes are being built with air source heat pumps which are rapidly becoming a viable alternative to traditional power sources such as boilers. These heat pumps in a residential setting can save more than 2 tonnes of carbon per year, contributing up to 20% less CO2e than gas boilers and up to 70% less than electric systems.
Our aim is to continually improve our environmental performance and to provide our clients with the appropriate level of support in order for them to attain and maintain their environmental goals and aspirations.


Project details:

Value: £6.5m

Project duration: 36 months

Client: Fairview New Homes