Olympic Way

Olympic Way

A landmark project in the Wembley Park grounds consisting of 211 units.

The project included supply and install of boosted cold water, central energy centre with CHP and gas boilers, BMS control system, LTHW distribution and HIUs, Heat meters and M-bus systems, dry riser, conventional radiators and under floor heating, installation of pre-fabricated soil stacks in HDPE & sanitary ware.

Woodford also completed air-conditioning works in project gym, MVHR ventilation in all units and gym, supply and extract fans and ductwork to 3 no. refuse stores, external rainwaters in aluminium and sprinkler system installation in all units and corridor store cupboards on floors 1-3.


The Key to Success

Matching the right Woodford team to reflect the client team was our key to success on Olympic way. We worked hard to understand the client team dynamic and selected to most suitable delivery team to work with them through the project delivery. A measure of success for us has been the repeat business and growing engagement with a client facing ever changing economic conditions in which to operate.


Statistics

The values include: 2,100KW (heat), 109KWTH (CHP thermal) and 70KWe (CHP electric)

Project details

  • Value: £6m
  • Project Duration: 12 Months
  • Client: Barratt London

What our client said

“Having worked on several complex Energy Centre installations, the work that the Woodford Heating team undertook on my project has been outstanding.”

Barratt Homes